
2009-Tamaron Kitchen and Master Bathroom
Project Description:
The kitchen cabinets were modified and re-faced. All new appliances were
installed along with new lighting, countertops, and backsplash. All the
walls were re-textured and painted. The original flooring was protected
and throughout the process.
Master Bath - All the finishes in the bathroom were replaced including the
shower, shower glass, jetted tub, lighting, mirrors, and wall texture. The
cabinet bases were re-used and new drawer slides and door were installed.